Nov 12 2014 in Blog by Solara
We thought that after we had moved in and unpacked that we would be able to sit back and relax a bit, not realizing that there was still so much to do. Not only with the building of the guardian casita, but there are so many things, both outside and inside our house, that need [ Read More…. ]
Nov 11 2014 in Quienes Somos by Solara
The two loving Cats of AN! Luna is the alpha animal of AN and is always aware of what is going on. She has a very high vibration and loves to be present and hold the energy during readings of the Cards of AN. Leo is the shy one with stripes. When he is comfortable [ Read More…. ]
Nov 5 2014 in Blog by Solara
It’s hard to believe that we’ve already been living here for just over a month. We feel so deeply comfortable living here that in some ways it feels like we’ve always lived here. But after a month of steady unpacking, sorting and organizing, we are still not completely settled. We are putting up window blinds, [ Read More…. ]
Oct 29 2014 in Blog by Solara
After nearly a month, we are still getting settled. The boxes have nearly all been unpacked, but there are still piles on the floor all over the house waiting to be sorted and resorted, then put into their right places. Every day we make noticeable progress, but there is always so much more to do. [ Read More…. ]
Oct 22 2014 in Blog by Solara
After two and a half weeks of non stop action, we now have practically everything unpacked and placed in baskets, bins and piles all over the house. Now, we just need to find their right places. This requires lots of intuition, listening to where everything belongs at The Heart of AN. And if the right [ Read More…. ]
Oct 15 2014 in Blog by Solara
Another super busy week as the unpacking continues. Each day is like running a marathon. Emanaku and I are working non-stop day and night while in a continual state of extreme tiredness. Small trails in each room are now becoming larger paths. Practically nothing is in its right place yet, but small islands of order [ Read More…. ]
Oct 9 2014 in Blog by Solara
We finally moved into our beautiful new house on October 3rd. Since then, it has been quite an intense journey (which I will write about in more detail in the October Surf Report which is still in progress.) We have been through supreme exhaustion, a painful pulled ligament and deep, detoxifying purification which led to [ Read More…. ]
Oct 1 2014 in Blog by Solara
This was another super exhausting and super exciting week at The Heart of AN. Many lamps were installed, although there are still more that need to be put into position. The bamboo floors were finished. The kitchen and bathrooms sinks were put into position. Slowly, but steadily, the closets and stairs were brought to completion. [ Read More…. ]
Sep 24 2014 in Blog by Solara
We are in the final stretch now and going full speed ahead so we can start moving in at the end of next week. It will take a few miracles, but it is possible and so tantalizingly close. This was a breakthrough week as our wood stove was installed, closets were built and gorgeous bamboo [ Read More…. ]
Sep 17 2014 in Blog by Solara
Some things moved forward rapidly, while other tasks slowed down as the plumber, electrician and kitchen carpenters disappeared. We are spending much of our time each day working at The Heart of AN and absolutely love being there. Emanaku has installed all the window fasteners and is sealing the grout in the bathrooms. Yesterday, he [ Read More…. ]
Sep 10 2014 in Blog by Solara
Super Fast Track at The Heart of AN this week! We are dealing with myriad details as we sprint down the final miles to completion. And it’s super inspiring to create the new Ultra Greater Reality AN architecture! Last Wednesday afternoon, three carpenters arrived from Cuzco and set to work building our kitchen. The kitchen [ Read More…. ]
Sep 3 2014 in Blog by Solara
There were both breakthroughs and slow downs at The Heart of AN this past week. We are really hoping to be able to move in on the Spring Equinox in a few weeks. But there are still some major projects that need to be done before we can move. At the top of the list [ Read More…. ]
Ago 27 2014 in Blog by Solara
It was yet another super busy week at The Heart of AN! ♥ Changes took place in so many areas. Glass was put into many of the windows. Carpenters started building the kitchen and bathroom cupboards and cabinets. More carpenters brought shelves for the pantry / deposito and art studio. Digging began on our eco [ Read More…. ]
Ago 20 2014 in Blog by Solara
This was a busy week with both accelerated progress and sudden stops at The Heart of AN. Sometimes the house was full of workers and much got done. Then there were times when people didn’t show up when they had promised to be there and it seemed that very little was accomplished. And much waiting [ Read More…. ]
Ago 13 2014 in Blog by Solara
It was another super productive week at The Heart of AN. ♥ There were both subtle refinements and some basic, very practical projects going on, such as the beginning of the installation of our water system to the house. Our bathroom experienced a major transformation and all our exterior gates have been built and installed! [ Read More…. ]