2015-04-15-16

There has been much progress on our small outdoor bathroom building which has a very gardeny feeling since we didn’t want to cut any trees. The stone steps are done and a small canal has been built to channel rainwater away from the building.

We still need to make the doors to the two toilets, and once the yeso is dry, paint everything! Today, the cement foundation is being covered with river rocks.

Leave a Reply

Your email address will not be published. Required fields are marked *