On the final day of March, the center point of the future Tower of Light of AN was established and placed into the ground. This felt surprisingly strong. It also felt as if our beautiful new sacred land had been waiting for this for a long time.
Since then, we’ve been traveling on the Fast Track. Every day, the energy from the Tower of Light of AN becomes stronger! This made it a bit challenging to write the April Surf Report while being infused with such powerful AN energies.
There is still much to do before the Activation of the Tower of Light of AN in May. Pedro and Roberto have been busy creating the eleven concentric circles for the Tower of Light and planting grass in the spaces-in-between the circles which will be delineated with river rocks. Elias and his crew have been installing the new fence which hopefully will be finished this week.
Next week, German will arrive to create a roofed doorway of river rock in the side of the new fence. This is similar to the existing doorway to the acequia canal near our house. After this is done, Danilo our metal worker, will make a wood and metal door for it. There is much more than this that is going on, but these are just some of the highlights.
A super strong group is coming together for the Activation of the Tower of Light of AN from May 18 – 25. We already have people coming from eight countries, including some of our magnificent 11:11 Family who are beyond brilliant holding and embodying the energy in ceremonies.
We still need eight more True Ones to participate in this life changing event so we can reach the master number of twenty-two. Everything will be in English and Spanish. We are also trying to find a Russian translator.
If you feel called to be part of this momentous event at the Heart of AN, here is the link for more information: anvisible.com/evs/activation-2017/
-
-
Walking on the border between our new land and older land and seeing all that still needs to be done so we will be ready for May’s Activation of the Tower of Light of AN.
-
-
On the last day of March, Emanaku and I created the centerpoint for the Tower of Light of AN. A metal rod was temporarily put into the ground with a row of branches extended outwars to show where the concentric circles are.
-
-
Emanaku carefully measured where the concentric circles would go and then couldn’t help, but to bask in the energies.
-
-
Grass is now being planted in between the circles which will be created with river rocks.
-
-
Pedro and Roberto outlined the eleven rings of concentric circles with yeso. <3 Even just with yeso on dirt, the energy here feels very powerful!
-
-
The future Tower of Light of AN already feels amazing. It is so strong, we can even feel it inside our house.
-
-
Here’s our car, La Perla, in Urubamba picking up metal bars for the new fence. (As well as some picarrones and chocolate pie at SaSa.)
-
-
Pedro is watering some of the pink flowers that have been removed from the old fence between our two lands. Once the new fence is in position, the flowers will be replanted next to it.
-
-
A temporary opening was created in the old fence between the lands so we could bring building materials onto the new land.
On the right, you can see how beautiful and natural the metal fence looks like with the pink flowers growing on it.
-
-
This new opening in the fence was especially exciting for Cachorro and Manzana. Although they were put on leashes, Cachorro could easily escape from his collar. Fortunately he really, really likes Pedro, and so it was easy for him to get Cachorro back.
-
-
A truck arrives early in the morning with the newly painted posts for our new fence.
-
-
Here’s Elias’ crew unloading posts and taking them through the fence opening.
-
-
Elias and his crew are putting up fence posts.
-
-
This will be the new public path on the far side of our AN•Sonqo land.
-
-
While digging holes for the fence posts, the workers discovered a large, old, handmade nail from the colonial days and gave it to Emanaku.
-
-
Pedro and Roberto are still planting grass in the spaces-in-between the circles of the Tower of Light. Soon, we want to fill all our new land with grass and lots of flowers.
-
-
Here’s Elias and his crew putting up the fence posts by the acequia canal.
-
-
Cachorro and Manzana on their leashes again as more building supplies are brought through the opening in the fence. <3 They don't look like they mind it though.
-
-
At the end of the day, the fence is closed up again.
-
-
A perky Manzana checks out the electricity cable which runs from our house to the new land.
-
-
Today, the new fence is being installed! It’s a bit shocking at first, but once it’s covered with pink flowers, it will be beautiful.
-
-
Pedro and I this very morning, standing happily beside the future Tower of Light of AN.
-
-
Elsewhere on our land, our strange tomatillo plant is full of fruit. We really need to try some soon. It could be delicious!