Much of the focus this past week was on finalizing the design for our AN• Labyrinth so we could begin creating it. We ordered more river rocks and Eloy is already busy putting them into position to delineate the paths. We are going to have German create the AN Circle in the middle of the labyrinth and he will start on it next week. It will be made of cement, solid glass blocks and colored glass tiles. This weekend I will have to create the design for it.
Emanaku finalized the design for the roof of the AN•Chakana. I first saw the design just by looking at the chakana, but couldn’t draw what I had seen. Fortunately, Emanaku has great skills into bringing these preliminary visions into form. We are a great designing team! German will build the roof as soon as he finishes the labyrinth.
We also bought some new fruit trees this past week, bringing our total to: 3 limes, 2 oranges, 1 fig, 1 avocado and 3 grenadine vines. Now we just have to wait for a year or two for our fruit! Too bad we didn’t have time to do this when we first bought the land.
For the past few days, I’ve had some vertebrae out of place in my neck which is rather painful, so have been definitely slowed down. Fortunately, today Eloy gave me a herbal mixture that he made from healing herbs on our land to put on my neck later this afternoon.
Other than that, all is well. We are happy, busy and deeply fulfilled to live here in the New Reality.
Our events in 2016: anvisible.com/events/
-
-
Leo is a master at perching himself in unexpected places. Here he is on the high ledge in my office!
-
-
Here is a medley of our designs for the AN•Labyrinth. It was quite a journey to arrive at the final design.
-
-
The AN•Labyrinth has been fully outlined with yeso plaster. Now Eloy is creating small ditches where the lines are in which to place river rocks.
-
-
The AN•Labrinth is steadily coming alive!
-
-
German, on the left, will be returning here next week to make the center circle of the AN•Labyrinth which will be composed of cement, solid glass blocks and colored glass tiles. (Which I still have to design.)
After that, he will build the new roof for the chakana and repaint some of our walls.
-
-
The AN•Labyrinth becomes more interesting every day.
-
-
The inside of the labyrinth will have paths of small river rocks while the outer rays will be outlined with larger river rocks to anchor it.
-
-
Our newly emerged rock makes an excellent sitting place in which to overlook the labyrinth.
-
-
Here is Emanaku’s professional drawing for the clear plastic roof which will go over the AN•Chakana to protect it from the sun and rain.
We are still trying to decide if we want to have the center of the roof in a different color, possibly a vibrant green or orange?
-
-
A few days before the Full Moon, Jupiter came very close.
-
-
So many of the plants are flowering right now at the Heart of AN. Hard to believe that it’s autumn instead of spring.
-
-
Everything is so sparkling here!
-
-
The AN energy of the New Reality continues to imbue everything with the New Freshness.
-
-
The exquiste Full Moon last night as seen from our bedroom balcony.
We could not see todays moon eclipse in the early morning hours – first because we had clouds, and later because the moon had already disappeared behind the closest mountain….